Barakah Nuclear Power Plant

Location
Location
Abu Dhabi, United Arab Emirates
Structure
Structure
Meteorological Station
Date completed
Date completed
2023
Owner
Owner
ENEC/Nawah
Barakah Nuclear Power Plant

Services Applied by VCS Engineering

Ground Penetrating Radar, Acoustic Inspection Methods

Project Introduction

Evaluation of structural integrity and durability was conducted for a 60-meter high cable-stayed meteorological mast, including its foundations and associated structures. This facility holds paramount importance in fulfilling the Health, Safety, and Environmental standards governing nuclear power plant operations, as mandated by the International Atomic Energy Agency (IAEA), the U.S. Nuclear Regulatory Commission (NRC), and UAE Federal Nuclear regulators. With a history exceeding 12 years, regulations stipulate annual assessments to ensure the facility's functionality, structural integrity, and stability. WSP, serving as the project's environmental consultant, subcontracted VCS to undertake the requisite testing and reporting for the facility.

Project Scope 

Utilizing the expertise of VCS engineers alongside tower specialists, we conducted a comprehensive assessment of the steel tower's integrity. This involved evaluating its current corrosion status, measuring the tension of the stay cables, and assessing the durability of the concrete foundations. Our approach employed various non-destructive testing (NDT) techniques to ensure a thorough examination.

An engineer performing GPR reading on a concrete slab

Project Solution

The nuclear industry demands strict adherence to health and safety protocols, compounded by the complexities of working at elevated heights, necessitating specialized equipment and certifications. VCS meticulously conducted inspections and testing in complete accordance with regulatory standards. Subsequently, they furnished the client with a comprehensive report, inclusive of recommendations aimed at safeguarding operational safety and preserving the structural integrity of the facility for the foreseeable future.
 
 
 
 
 
 