Projects

CT River Bridge US Route 18

Location
Location
Littleton, New Hampshire, United States
Structure
Structure
Bridge
Date completed
Date completed
2021
Owner
Owner
New Hampshire DOT
Client
Client
Dubois and King
CT River Bridge US Route 18
In partnership with:
CT River Bridge US Route 18

Project Introduction

Route 18, crossing the Connecticut River, a 5-span bridge between New Hampshire and Vermont, was being evaluated by NHDOT’s engineering consultant. The superstructure was being replaced, but the possibility of preserving the concrete substructure was unknown—the internal condition of four concrete bridge piers and two abutments needed to be quantified.   The challenge is whether shallow surface repairs can extend the substructure’s service life or if removal and replacement of the substructure is required.  NDT Division was contracted to perform various nondestructive test methods to determine the condition and durability of the substructure to assist the engineering team with their evaluation of the bridge. 

Project Scope

NDT Division used nondestructive impact echo/pulse velocity (IE/PV) at the concrete surface and through testing to determine concrete strength by measuring the velocity of compressional and shear waves propagating through the concrete.  Ground penetrating radar (GPR) and corrosion potential measurements were also collected to determine the cover depth and risk for corrosion of the steel reinforcement in the piers. These measurements helped quantify the concrete deterioration's depth, severity, and extent. 

IE/PV through testing evaluating the internal compressive strength of the concrete

Project Results

The multiple non-destructive testing approaches conducted by NDT Corp. provided the engineering team with details of the extent of deterioration of the concrete, including risk for corrosion, delaminations, and the in-situ compressive strength. Surface and through testing measurements confirmed that the substructure's internal concrete condition was adequate to preserve the piers, requiring only external superficial repairs.  The work conducted by NDT Corp. ultimately reduced the cost of the rehabilitation project, saving the owner millions of dollars by reusing the existing concrete pier foundations and reducing the construction schedule by well over six months.  

the IE/PV results of the concrete strength at the surface and in the core of the pier
the IE/PV results of the concrete strength at the surface and in the core of the pier